Charleston - JE Dunn Construction https://jedunn.com In Pursuit of Building perfection Fri, 12 Dec 2025 22:19:03 +0000 en-US hourly 1 https://wordpress.org/?v=6.8.3 https://jedunn.com/wp-content/uploads/2023/02/logo-circle-only.png Charleston - JE Dunn Construction https://jedunn.com 32 32 MYR – Myrtle Beach International Airport https://jedunn.com/projects/myr-myrtle-beach-international-airport/ Thu, 14 Aug 2025 22:24:59 +0000 https://jedunn.com/?post_type=projects&p=43173 Consider this: Top design elements crucial to an airport parking garage’s success https://jedunn.com/blog/consider-this-top-design-elements-crucial-to-an-airport-parking-garages-success/ Thu, 16 Nov 2023 15:34:13 +0000 https://jedunn.com/?post_type=blog&p=24917 How JE Dunn partnered with top airports to design parking facilities that enhance passenger satisfaction, push the design envelope, and provide crucial sources of operational revenue

The post Consider this: Top design elements crucial to an airport parking garage’s success first appeared on JE Dunn Construction.

]]>

When people think of airports, they often picture bustling terminals, runways, and aircraft. However, an integral component of airport infrastructure is typically the first thing they encounter – the parking garage. These multi-level facilities play a pivotal role in local travelers’ experiences, often serving as the gateway to and from their hometown. And for almost every airport, and some cities, they also provide a crucial source of operational revenue.

There are three top design considerations to lean into when building an airport parking garage that meets the needs of locals, travelers, and municipalities alike: safety, sustainability, and equity. The recently completed parking garages at Kansas City International Airport (MCI) and Portland International Airport (PDX) highlight how these considerations can come to life in unique and innovative ways, from sketch to completion.

Safety

The safety and security of both vehicles and patrons in a parking garage are paramount. Modern parking garages incorporate advanced safety measures such as clear signage, well-placed lighting, surveillance cameras, and emergency call boxes. Oftentimes, access control systems and automated payment options add an extra layer of security.

At KCI, beyond providing ample parking and safety features, the parking garage offers speed ramps for safe navigation, quick access to all levels of the garage, valet parking for convenience, and commercial lanes for added accessibility.

Sustainability

In an age of environmental consciousness, sustainable design is a must. At minimum, parking structures are implementing eco-friendly elements like LED lighting, natural ventilation, and recycled materials. More forward-thinking structures are incorporating solar panels on the roof to generate clean energy, and electric vehicle charging stations to promote sustainability. Many airports are even looking to incorporate multi-modal transportation centers into new parking facilities to allow for the extension of light rail to be incorporated at a later date.

At KCI, JE Dunn helped implement many of these sustainable strategies. The completed facility provides 62 dual electric vehicle charging stations and multiple ADA compliant electric vehicle charging stations. Additional electrical pathways are provided for expansion of the charging infrastructure as vehicles become increasingly electric, and the garage’s commercial curb also includes wireless inductive charging to allow the airport’s fleet of electric buses to charge while loading and unloading passengers.

At PDX, JE Dunn partnered to provide three components: a new six-level, 1.64M square foot parking structure with approximately 2,290 long-term parking spaces for travelers on the upper three levels and approximately 2,070 ready/return spaces for rental car operations on the lower three levels. Sustainability took center stage in every decision, from the building’s exterior envelope, including upgraded wall and roof insulation, a sustainable window system with advanced daylighting and an infiltration system, to high efficiency water-source radiant heating and cooling systems and a ventilation air system to provide energy efficiency and better indoor air quality. Additionally, CarbonCure concrete was used to reduce carbon impacts in the construction process.

Equity

Every project creates a possibility to improve communities and the many lives of people within them. An important part of JE Dunn’s collaboration with MCI was incorporating equity in the construction phase of the project. JE Dunn implemented its mentor-protege program partner and its overall diversity goals, and as a collaborative effort with its design partner and other design consultants, a concentrated effort to exceed 20% MBE and 15% WBE participation was achieved. JE Dunn’s efforts were successful, resulting in a 48% M/WBE participation.

This collaboration also included JE Dunn estimators, executives, and project managers working together to teach the business. Equitable risk allocation among the design-build team was achieved through the “Best Value Selection” process for critical key trade partners. The design-build team decided to partner with JE Dunn’s structural, mechanical, electrical, and concrete trade partners through the best value selection process. In addition, DBE foremen participated in JE Dunn planning meetings with experienced JE Dunn foremen to learn how to plan and execute.

PDX provided a prime opportunity to engage and grow the capacity of minority-owned, women-owned, small businesses (MWESB) and disadvantaged firms. In order to maximize participation, scopes of work were scaled appropriately to enable more participation by COBID firms. By creating smaller packages that fit the capacity and abilities of more MWESB firms, the project was able to award work to 76 contractors and 15 designers.

What sets these parking structures apart is their adaptability and sustainability. They weren’t just built for the present. They were built to evolve with each airport’s changing needs – and the evolving needs of our society.

The post Consider this: Top design elements crucial to an airport parking garage’s success first appeared on JE Dunn Construction.

]]>
Atlantic on Romney https://jedunn.com/projects/atlantic-on-romney/ Wed, 04 Jan 2023 17:41:23 +0000 https://jedunn.com/?post_type=projects&p=9626 The Atlantic on Romney project is located in the heart of downtown Charleston with close proximity to several surrounding residential buildings and business. Located on an incredibly tight site on peninsular Charleston, this project consists of a nine-story, three hundred four-unit apartment building that includes two levels of a parking garage with retail space on […]

The post Atlantic on Romney first appeared on JE Dunn Construction.

]]>
The Atlantic on Romney project is located in the heart of downtown Charleston with close proximity to several surrounding residential buildings and business. Located on an incredibly tight site on peninsular Charleston, this project consists of a nine-story, three hundred four-unit apartment building that includes two levels of a parking garage with retail space on the ground level. The apartment units are broken into four separate towers that extend seven stories above the parking garage. Each of the four towers have drastically different façades. The project also includes an amenity level with a pool, clubroom, fitness areas, and a game room. This project will be Charleston Rises certified upon completion.

The post Atlantic on Romney first appeared on JE Dunn Construction.

]]>
The Caroline https://jedunn.com/projects/the-caroline/ Wed, 04 Jan 2023 17:36:12 +0000 https://jedunn.com/?post_type=projects&p=9627 Caroline Luxury Apartments is a 607,153 SF, seven-story apartment tower located near The Citadel. The project is directly behind the Charleston Metro Police Department headquarters and shares a garage with them. The two-building project contains 237 residential units and a 264,000 SF, 1,005-space precast parking garage. As The Caroline is located on the Charleston peninsula, […]

The post The Caroline first appeared on JE Dunn Construction.

]]>
Caroline Luxury Apartments is a 607,153 SF, seven-story apartment tower located near The Citadel. The project is directly behind the Charleston Metro Police Department headquarters and shares a garage with them. The two-building project contains 237 residential units and a 264,000 SF, 1,005-space precast parking garage. As The Caroline is located on the Charleston peninsula, the foundation system is extremely important. The system consists of 1,092 precast driven piles integrated into a series of grade beams and pile caps. Due to the project’s location on a brownfield site, the slab on grade system was designed to be fully supported by the pile caps and grade beams. This allows the soil beneath the building to lower in elevation without affecting any structural or architectural components.

The post The Caroline first appeared on JE Dunn Construction.

]]>
Trident Medical Center https://jedunn.com/projects/trident-medical-center/ Fri, 30 Dec 2022 16:55:37 +0000 https://jedunn.com/?post_type=projects&p=9634 This project with HCA consists of two concurrent projects, the ED renovation and OR Addition. The ED renovation was a 18,800 SF multi phase renovation to the Level 2 Trauma Center at Trident Medical University. The renovation added a new CT scanner, new fast track unit, a new Behavioral Health unit, and finish upgrades throughout. […]

The post Trident Medical Center first appeared on JE Dunn Construction.

]]>
This project with HCA consists of two concurrent projects, the ED renovation and OR Addition.

The ED renovation was a 18,800 SF multi phase renovation to the Level 2 Trauma Center at Trident Medical University. The renovation added a new CT scanner, new fast track unit, a new Behavioral Health unit, and finish upgrades throughout.

The OR Addition consisted of 3 new Operating Rooms and included a renovation that converts an existing OR to PACU bays.

The post Trident Medical Center first appeared on JE Dunn Construction.

]]>
Charleston County School District High School Stadium https://jedunn.com/projects/charleston-county-school-district-high-school-stadium/ Wed, 21 Dec 2022 19:52:53 +0000 https://jedunn.com/?post_type=projects&p=9632 The Charleston County School District Stadium, a design-build project with LS3P Architects, is a 6,000-seat high school athletic facility shared by four high schools in the District. The project includes, but is not limited to synthetic multi sports fields, field house, concessions, and an elevated press box connected to the stands on the home side. […]

The post Charleston County School District High School Stadium first appeared on JE Dunn Construction.

]]>
The Charleston County School District Stadium, a design-build project with LS3P Architects, is a 6,000-seat high school athletic facility shared by four high schools in the District. The project includes, but is not limited to synthetic multi sports fields, field house, concessions, and an elevated press box connected to the stands on the home side. There are 1,500 parking spaces spread throughout the site to service the stadium.

The post Charleston County School District High School Stadium first appeared on JE Dunn Construction.

]]>
Robert Smalls Leadership Academy https://jedunn.com/projects/robert-smalls-leadership-academy/ Wed, 21 Dec 2022 17:35:20 +0000 https://jedunn.com/?post_type=projects&p=9625 In collaborating with our minority business partner, Brownstone, JE Dun is currently building this 1000 student K8 school to replace the existing building. Our scope includes the demolition of the existing structure and constructing the two story K8 replacement school. The school, which will embrace after hours community use, will include a full middle school […]

The post Robert Smalls Leadership Academy first appeared on JE Dunn Construction.

]]>
In collaborating with our minority business partner, Brownstone, JE Dun is currently building this 1000 student K8 school to replace the existing building. Our scope includes the demolition of the existing structure and constructing the two story K8 replacement school. The school, which will embrace after hours community use, will include a full middle school athletic complex, gymnasium, parking, bus drop off, cafeteria, media center, and academic wings.
Robert Smalls is an important historic figure in the lowcountry, and our team is cognizant of the historic significance and importance to the community at large.

The post Robert Smalls Leadership Academy first appeared on JE Dunn Construction.

]]>