Tampa - JE Dunn Construction https://jedunn.com In Pursuit of Building perfection Tue, 04 Nov 2025 16:29:49 +0000 en-US hourly 1 https://wordpress.org/?v=6.8.3 https://jedunn.com/wp-content/uploads/2023/02/logo-circle-only.png Tampa - JE Dunn Construction https://jedunn.com 32 32 Maria Escalona Making Her Mark In Tampa https://jedunn.com/news/maria-escalona-making-her-mark-in-tampa/ Sat, 18 Oct 2025 14:34:58 +0000 https://jedunn.com/?post_type=in-the-news&p=46159 Florida Healthcare Project featured in Commercial Construction & Renovation Magazine https://jedunn.com/news/florida-healthcare-project-featured-in-commercial-construction-renovation-magazine/ Tue, 14 Oct 2025 19:33:51 +0000 https://jedunn.com/?post_type=in-the-news&p=46130 HCA Kendall Regional Medical Center Expansion https://jedunn.com/projects/hca-kendall-regional-medical-center-expansion/ Thu, 15 Feb 2024 15:17:16 +0000 https://jedunn.com/projects/hca-kendall-regional-medical-center-expansion/ JE Dunn completed a large, 123,000 square foot expansion and renovation at Kendall Regional Medical Center. The existing facility included four floors with a helipad on the roof. A new two-story vertical expansion of the bed tower added over 82,000 square feet and 77 new private patient rooms. One floor also houses a new trauma/ICU […]

The post HCA Kendall Regional Medical Center Expansion first appeared on JE Dunn Construction.

]]>
JE Dunn completed a large, 123,000 square foot expansion and renovation at Kendall Regional Medical Center. The existing facility included four floors with a helipad on the roof. A new two-story vertical expansion of the bed tower added over 82,000 square feet and 77 new private patient rooms. One floor also houses a new trauma/ICU area while the other provides additional women’s and children’s spaces. An additional three floors totaling over 38,000 square feet of ancillary renovation work also house a new kitchen, dining area, servery, NICU, administrative area, and lab space.

The project scope also involved demolishing the existing storm line in the patient tower to extend sanitary service, which required the roof to be extended to connect utilities to the new patient floors.

The post HCA Kendall Regional Medical Center Expansion first appeared on JE Dunn Construction.

]]>
HCA Westside Regional Medical Center Tower https://jedunn.com/projects/hca-westside-regional-medical-center-tower/ Thu, 15 Feb 2024 14:50:29 +0000 https://jedunn.com/projects/hca-westside-regional-medical-center-tower/ This project includes a tower features 72 new private rooms, that will give patients and their families a comfortable, healing environment. The expansion to the facility also includes a new lobby and entrance area, registration area, gift shop and café on the ground floor. The first and second floors each have 36 private patient rooms […]

The post HCA Westside Regional Medical Center Tower first appeared on JE Dunn Construction.

]]>
This project includes a tower features 72 new private rooms, that will give patients and their families a comfortable, healing environment. The expansion to the facility also includes a new lobby and entrance area, registration area, gift shop and café on the ground floor. The first and second floors each have 36 private patient rooms with increased natural light as each patient room has a window, providing a comfortable, healing environment. The expansion to the facility also includes a new lobby and entrance area, registration area, gift shop and café on the ground floor.

Additional enhancements to Westside include an enlarged surgical recovery area, renovated cafeteria, and a 15,000 square foot refresh of the interiors in the existing hospital. The project scope also included a powerhouse expansion and renovation, lift station, and site drainage upgrades.

The post HCA Westside Regional Medical Center Tower first appeared on JE Dunn Construction.

]]>
BayCare Morton Plant Hospital https://jedunn.com/projects/baycare-morton-plant-hospital/ Fri, 09 Feb 2024 16:10:07 +0000 https://jedunn.com/projects/baycare-morton-plant-hospital/ JE Dunn provided construction management services for Morton Plant Hospital’s patient tower expansion and renovation. This multi-year project was executed on a highly active healthcare campus, with work being performed adjacent to an active emergency department. The project scope included the addition of a new 230,000 square foot four-story patient tower with a fifth floor […]

The post BayCare Morton Plant Hospital first appeared on JE Dunn Construction.

]]>
JE Dunn provided construction management services for Morton Plant Hospital’s patient tower expansion and renovation. This multi-year project was executed on a highly active healthcare campus, with work being performed adjacent to an active emergency department. The project scope included the addition of a new 230,000 square foot four-story patient tower with a fifth floor dedicated to mechanical and electrical systems, the Doyle Tower, and 154,00 square feet of renovations. Floors one through four house patient care areas and support spaces, including 183 patient beds, 23 operating rooms with an interoperative (IMRI) suite, a level two NICU, PACU, a blood bank, a chemotherapy lab, an orthopedics unit, and a new labor and delivery unit. It also includes seven new elevators and the renovation of two existing elevators.

In the existing six-story Adler Building, JE Dunn updated the hospital with a women’s center, newborn nursery, behavioral health, and orthopedics units.

And prior to the construction of the Doyle Tower, JE Dunn self-performed the construction of an underground utility tunnel connecting Adler and Doyle. This corridor serves as the main MEP utility connection between the two structures.

The post BayCare Morton Plant Hospital first appeared on JE Dunn Construction.

]]>
Pinellas County School District Tarpon Springs High School https://jedunn.com/projects/pinellas-county-school-district-tarpon-springs/ Fri, 09 Feb 2024 15:54:59 +0000 https://jedunn.com/projects/pinellas-county-school-district-2/ Tarpon Springs High School’s Leadership Conservatory for the Arts is a nationally acclaimed, award-winning music and arts program. During the nine months following Summer 2018, JE Dunn coordinated closely with the school to give this program a new home at the front of campus. This 12,561 square foot new building provides new classroom and teacher […]

The post Pinellas County School District Tarpon Springs High School first appeared on JE Dunn Construction.

]]>
Tarpon Springs High School’s Leadership Conservatory for the Arts is a nationally acclaimed, award-winning music and arts program. During the nine months following Summer 2018, JE Dunn coordinated closely with the school to give this program a new home at the front of campus. This 12,561 square foot new building provides new classroom and teacher work spaces, with rooms for individual and group practice and instruction. The existing multi-purpose room and gymnasium were also fully renovated while the new addition was being constructed. These renovated spaces, in addition to the new space, include upgraded acoustics and state-of-the-art audio/visual technologies.

Overall, the Tarpon Springs project includes renovations in nine buildings on campus. Work on the Tarpon Springs campus also included a covered space for the color guard to practice.

The post Pinellas County School District Tarpon Springs High School first appeared on JE Dunn Construction.

]]>
Pinellas County School District Richard O. Jacobson Technical High School https://jedunn.com/projects/pinellas-county-school-district-richard-o-jacobson-technical/ Fri, 09 Feb 2024 15:43:01 +0000 https://jedunn.com/projects/pinellas-county-school-district/ JE Dunn built a 38,000 square foot new building and delivered 17,500 square feet of renovations to an existing building on the occupied campus of Pinellas Technical High School. The new building includes an administration wing, classrooms, labs, restrooms, and multi-purpose/cafeteria space. Renovations to the existing building included the replacement of all ceilings and light […]

The post Pinellas County School District Richard O. Jacobson Technical High School first appeared on JE Dunn Construction.

]]>
JE Dunn built a 38,000 square foot new building and delivered 17,500 square feet of renovations to an existing building on the occupied campus of Pinellas Technical High School. The new building includes an administration wing, classrooms, labs, restrooms, and multi-purpose/cafeteria space. Renovations to the existing building included the replacement of all ceilings and light fixtures, as well as new paint in all rooms. The administrative office area in that building was converted into a laboratory teaching space.

JE Dunn also added an 8,797 square feet new veterinary building to ROJTHS campus. The new building is home to two Veterinary classrooms, a veterinary Laboratory with dog wash, laundry and custodial areas, a shower, lockers for the student’s farm attire and mechanical and electrical service rooms. The scope also included demolition of four buildings on the existing campus, the addition of a new bus loop and renovation of the front entrance of the school’s campus.

The post Pinellas County School District Richard O. Jacobson Technical High School first appeared on JE Dunn Construction.

]]>
Hillsborough County Schools Broward Elementary School https://jedunn.com/projects/hillsborough-county-schools-broward-elementary-school/ Fri, 09 Feb 2024 15:27:11 +0000 https://jedunn.com/projects/hillsborough-county-schools/ This project primarily consisted of the replacement of all HVAC equipment on campus, replacement of the campus phone and intercom system, replacement of the casework, and replacement of selective floor and base finishes. In conjunction with the major scopes of work, a majority of the walls were painted on campus as well. After observing existing […]

The post Hillsborough County Schools Broward Elementary School first appeared on JE Dunn Construction.

]]>
This project primarily consisted of the replacement of all HVAC equipment on campus, replacement of the campus phone and intercom system, replacement of the casework, and replacement of selective floor and base finishes. In conjunction with the major scopes of work, a majority of the walls were painted on campus as well. After observing existing moisture infiltration issues, the exterior walls were remediated and all exterior window and masonry caulking was replaced.

The post Hillsborough County Schools Broward Elementary School first appeared on JE Dunn Construction.

]]>
Tampa General Health Behavioral Health Hospital https://jedunn.com/projects/tampa-general-health-behavioral-health-hospital/ Wed, 31 Jan 2024 14:25:11 +0000 https://jedunn.com/projects/tampa-general-health-behavioral-health-hospital/ The hospital, which is planned to be approximately 91,000 square feet with 120 inpatient beds, will feature dedicated units for treating patients with behavioral health issues compounded by other medical conditions. The new hospital is the result of a joint venture partnership between Tampa General Hospital and Lifepoint Behavioral Health, a business unit of Lifepoint […]

The post Tampa General Health Behavioral Health Hospital first appeared on JE Dunn Construction.

]]>
The hospital, which is planned to be approximately 91,000 square feet with 120 inpatient beds, will feature dedicated units for treating patients with behavioral health issues compounded by other medical conditions.

The new hospital is the result of a joint venture partnership between Tampa General Hospital and Lifepoint Behavioral Health, a business unit of Lifepoint Health, announced last year. Tampa General Hospital will provide a number of facility and medical support services, while Lifepoint Behavioral Health will manage the day-to-day operations. Physicians with the Department of Psychiatry and Behavioral Neurosciences in the USF Health Morsani College of Medicine will provide a full range of inpatient and outpatient care in specialized units for pediatrics, adolescents, adults and geriatrics.

The post Tampa General Health Behavioral Health Hospital first appeared on JE Dunn Construction.

]]>
Consider this: Top design elements crucial to an airport parking garage’s success https://jedunn.com/blog/consider-this-top-design-elements-crucial-to-an-airport-parking-garages-success/ Thu, 16 Nov 2023 15:34:13 +0000 https://jedunn.com/?post_type=blog&p=24917 How JE Dunn partnered with top airports to design parking facilities that enhance passenger satisfaction, push the design envelope, and provide crucial sources of operational revenue

The post Consider this: Top design elements crucial to an airport parking garage’s success first appeared on JE Dunn Construction.

]]>

When people think of airports, they often picture bustling terminals, runways, and aircraft. However, an integral component of airport infrastructure is typically the first thing they encounter – the parking garage. These multi-level facilities play a pivotal role in local travelers’ experiences, often serving as the gateway to and from their hometown. And for almost every airport, and some cities, they also provide a crucial source of operational revenue.

There are three top design considerations to lean into when building an airport parking garage that meets the needs of locals, travelers, and municipalities alike: safety, sustainability, and equity. The recently completed parking garages at Kansas City International Airport (MCI) and Portland International Airport (PDX) highlight how these considerations can come to life in unique and innovative ways, from sketch to completion.

Safety

The safety and security of both vehicles and patrons in a parking garage are paramount. Modern parking garages incorporate advanced safety measures such as clear signage, well-placed lighting, surveillance cameras, and emergency call boxes. Oftentimes, access control systems and automated payment options add an extra layer of security.

At KCI, beyond providing ample parking and safety features, the parking garage offers speed ramps for safe navigation, quick access to all levels of the garage, valet parking for convenience, and commercial lanes for added accessibility.

Sustainability

In an age of environmental consciousness, sustainable design is a must. At minimum, parking structures are implementing eco-friendly elements like LED lighting, natural ventilation, and recycled materials. More forward-thinking structures are incorporating solar panels on the roof to generate clean energy, and electric vehicle charging stations to promote sustainability. Many airports are even looking to incorporate multi-modal transportation centers into new parking facilities to allow for the extension of light rail to be incorporated at a later date.

At KCI, JE Dunn helped implement many of these sustainable strategies. The completed facility provides 62 dual electric vehicle charging stations and multiple ADA compliant electric vehicle charging stations. Additional electrical pathways are provided for expansion of the charging infrastructure as vehicles become increasingly electric, and the garage’s commercial curb also includes wireless inductive charging to allow the airport’s fleet of electric buses to charge while loading and unloading passengers.

At PDX, JE Dunn partnered to provide three components: a new six-level, 1.64M square foot parking structure with approximately 2,290 long-term parking spaces for travelers on the upper three levels and approximately 2,070 ready/return spaces for rental car operations on the lower three levels. Sustainability took center stage in every decision, from the building’s exterior envelope, including upgraded wall and roof insulation, a sustainable window system with advanced daylighting and an infiltration system, to high efficiency water-source radiant heating and cooling systems and a ventilation air system to provide energy efficiency and better indoor air quality. Additionally, CarbonCure concrete was used to reduce carbon impacts in the construction process.

Equity

Every project creates a possibility to improve communities and the many lives of people within them. An important part of JE Dunn’s collaboration with MCI was incorporating equity in the construction phase of the project. JE Dunn implemented its mentor-protege program partner and its overall diversity goals, and as a collaborative effort with its design partner and other design consultants, a concentrated effort to exceed 20% MBE and 15% WBE participation was achieved. JE Dunn’s efforts were successful, resulting in a 48% M/WBE participation.

This collaboration also included JE Dunn estimators, executives, and project managers working together to teach the business. Equitable risk allocation among the design-build team was achieved through the “Best Value Selection” process for critical key trade partners. The design-build team decided to partner with JE Dunn’s structural, mechanical, electrical, and concrete trade partners through the best value selection process. In addition, DBE foremen participated in JE Dunn planning meetings with experienced JE Dunn foremen to learn how to plan and execute.

PDX provided a prime opportunity to engage and grow the capacity of minority-owned, women-owned, small businesses (MWESB) and disadvantaged firms. In order to maximize participation, scopes of work were scaled appropriately to enable more participation by COBID firms. By creating smaller packages that fit the capacity and abilities of more MWESB firms, the project was able to award work to 76 contractors and 15 designers.

What sets these parking structures apart is their adaptability and sustainability. They weren’t just built for the present. They were built to evolve with each airport’s changing needs – and the evolving needs of our society.

The post Consider this: Top design elements crucial to an airport parking garage’s success first appeared on JE Dunn Construction.

]]>