{"id":6639,"date":"2020-08-14T00:00:00","date_gmt":"2020-08-14T05:00:00","guid":{"rendered":"https:\/\/jedunn.com\/blog\/raising-bar-prefab-and-lean-deliver-sarah-cannon-cancer-center\/"},"modified":"2023-06-08T11:16:54","modified_gmt":"2023-06-08T16:16:54","slug":"raising-bar-prefab-and-lean-deliver-sarah-cannon-cancer-center","status":"publish","type":"blog","link":"https:\/\/jedunn.com\/blog\/raising-bar-prefab-and-lean-deliver-sarah-cannon-cancer-center\/","title":{"rendered":"Raising the Bar: Prefab and Lean Deliver Sarah Cannon Cancer Center"},"content":{"rendered":"<p>Prefab and lean approach deliver the new Sarah Cannon Cancer Hospital, located on the existing Medical City Plano campus in Texas. It is a 138,000-square-foot, four-story patient tower, providing patients with access to leading-edge cancer therapies, advanced technology, research and support thanks to the partnership with Sarah Cannon \u2014 the cancer institute of HCA Healthcare.<\/p>\n<p>It is the first North Texas hospital to offer a new system for robot-assisted bronchoscopy, which allows physicians to diagnose and treat hard-to-reach, small peripheral lung tumors with greater precision. Key features of the LEED Gold-certified hospital include 60 new medical\/surgery beds, 30 burn and trauma ICU beds, Starbucks caf\u00e9, gift shop and office space and an expanded 12,000-square-foot utility plant.<\/p>\n<p>Beyond oncology services, the facility is home to a burn and trauma ICU unit. The new facility was designed to have a clean, contemporary aesthetic, while also considering and responding to the language of the existing campus. Consistent material elements were applied, such as stone stair towers that appear throughout the campus. The look of the campus\u2019 ribbon windows was replicated using dark panels and glazing. This allowed the team to seamlessly extend the existing campus, while simultaneously creating a unique and fresh aesthetic for the new tower.<\/p>\n<p>An open concourse provides wayfinding and connection to the campus, flooding the lower level with natural light and providing views to the exterior. With the exterior materials, dark and light create a juxtaposition that unifies the tower with the existing campus and provides a contemporary feel to the end result.<\/p>\n<p><strong>Creating a culture of collaboration<\/strong><br \/>\nThe team charged with designing and building the Sarah Cannon Cancer Hospital at Medical City Plano knew achieving the owner\u2019s aggressive goals would require a unique approach. One of the first strategies for setting up the greenfield project for success was the owner\u2019s challenge to the team to establish ambitious targets regarding schedule, cost and prefabrication.<\/p>\n<p>Before the team could even start planning the work, they had to select the right team members and develop a deep culture of collaboration. \u201cWe knew a willingness to collaborate, embrace Lean principles and innovate like never before would be important. So, we looked for team members and partners with that mindset who were excited to think outside of the box and try new things together,\u201d said JE Dunn Construction Vice President and Healthcare Group Manager Russell Templin.<\/p>\n<p><strong>Employing a Lean approach<\/strong><br \/>\nPart of maintaining a Lean approach from beginning to end involved employing best practices to optimize productivity, value and results. During the initial stages of the project, the team enlisted the expertise of Lean Program Director Bill Fusco to help lead the way.<\/p>\n<p>Similarly, trade partners also identified Lean champions to help drive best practices and capture data to measure productivity and progress against the team\u2019s overarching objectives. To capitalize on the Lean effort, the team also relied on shared responsibility to keep each other accountable.<\/p>\n<p>\u201cWe utilized the Last Planner System for the entire project, starting with design all the way through inspection and occupancy,\u201d said Fusco. \u201cWe also organized a number of multi-disciplinary cluster groups with responsibility for planning, processes, decision making, metrics and overall results for their respective project components.\u201d<\/p>\n<p><strong>Early VDC\u00a0 and\u00a0 extensive\u00a0 prefabrication<\/strong><br \/>\nThe early, extensive use of modeling was key to moving quickly, allowing for more schedule certainty and productivity in the field. Instead of designing and then trying to figure out what could be prefabricated, the team did the reverse \u2014 really kicking the tires on \u201cwhat could we possibly prefabricate?\u201d and pushing the envelope of what the team thought might be possible.<\/p>\n<p>This mentality and approach challenged the team\u2019s thinking and facilitated the innovation necessary to meet their lofty offsite prefabrication goal. \u201cWe operated with a prefabricate-first mindset,\u201d said Healthcare VDC Director Sara Curry. \u201cWe utilized the cross-functional cluster groups for key components, such as MEP corridor and patient room racks and exterior skin, to hold everyone accountable and improve planning and coordination efficiency.\u201d<\/p>\n<p>Curry added that this resulted in 3D models of all prefabricated components, allowing the project team to take conceptual ideas and put them into files alongside the design team in order to leverage each partner\u2019s expertise and increase collaboration. \u201cIt allowed us to have the model waiting on the building instead of the building waiting on the model,\u201d Curry said.<\/p>\n<p>Planning the project around the goal to maximize prefabrication resulted in the following prefabrication numbers:<\/p>\n<ul>\n<li>252 exterior skin panels<\/li>\n<li>63 overhead multi-trade corridor racks<\/li>\n<li>51 multi-trade overhead patient room racks<\/li>\n<li>90 headwalls and sinkwalls<\/li>\n<li>105 bathroom pods<\/li>\n<li>15 nurse charting stations<\/li>\n<\/ul>\n<p>Additional prefabricated components included electrical rooms and underground electric duct banks. \u201cEvery prefabricated component helped accelerate the schedule, but the time savings with exterior panels was particularly critical,\u201d said JE Dunn General Superintendent Marty Corrado.<\/p>\n<p>The panels were prefabricated, including the glass, and water-tested prior to installation. Not only did this provide another opportunity for quality control, but it also allowed the team to install the skin in eight weeks instead of six months, according to Corrado. \u201cWe gained even more efficiencies thanks to our ability to dry in the building sooner, because then we were also able to install other components much earlier than we typically could,\u201d Corrado added.<\/p>\n<p><strong>Creating a blueprint<\/strong><br \/>\nOnce complete, the collaborative effort to implement Lean principles and a prefabricate-first mindset revealed remarkable results. The team relocated more than 94,000 trade partner hours offsite for premanufactured components, ultimately reducing the entire project schedule by 6.7%, saving the client two months on a 27-month design and construction schedule, while also saving over $8.7 million. In addition, there were zero safety recordables and over 80% fewer RFIs than usual on a comparable project using more traditional methods \u2014 further evidence the team\u2019s methods greatly enhanced results across the board.<\/p>\n<p>To help other teams follow in their footsteps, team members documented lessons learned and created a blueprint of sorts, complete with detailed processes and tools. \u201cWe developed a matrix to help identify the best, smartest opportunities for prefabrication on a project,\u201d said Curry. \u201cProject teams interested in extensive prefabrication use it during the design and preconstruction phases to ensure they are asking the right questions and involving the right people at the right time.\u201d<\/p>\n<p>The success of the project has also helped refine processes to become even more Lean. \u201cSince the completion of the project, we have collaborated with trade partners to conduct value-stream mapping for various prefabrication and installation processes. This Lean management method involves assessing ways to improve current state processes and design even more efficient future state processes and results,\u201d said Fusco.<\/p>\n<p><strong>Importance of partnerships<\/strong><br \/>\nAs the urgency of speed to market becomes even more critical in today\u2019s times, the schedule certainty and acceleration possible with the approach used for Plano\u2019s Sarah Cannon Cancer Hospital can be a major advantage \u2014 but it\u2019s not the only factor.<\/p>\n<p>\u201cMedical City Healthcare\u2019s partnership and its corporate leaders were integral to meeting the goals they challenged us to achieve,\u201d added Templin. \u201cFrom early and firm decision making to working as a true partner, they cultivated a collaborative and inclusive environment, helping all of us set the bar higher while challenging us to think differently. The results have now paved the way for even greater innovation and outcomes in the future.\u201d<\/p>\n<p>Click <a href=\"https:\/\/lsc-pagepro.mydigitalpublication.com\/publication\/?m=55877&amp;i=669360&amp;p=38&amp;ver=html5\">here<\/a> to read the article as it appears in <em>Medical Construction and Design<\/em>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lofty goals, a collaborative approach, and extreme prefabrication led to cost savings and reduced schedule for the first LEED v4 for Healthcare Gold certified facility in the US.<\/p>\n","protected":false},"featured_media":6641,"template":"","meta":{"content-type":"","_lmt_disableupdate":"","_lmt_disable":""},"campaigns":[],"type-of-content_tax":[342],"class_list":["post-6639","blog","type-blog","status-publish","has-post-thumbnail","hentry","type-of-content_tax-prefabrication-manufacturing-content","locations_tax-dallas","expertise_tax-healthcare"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/jedunn.com\/wp-json\/wp\/v2\/blog\/6639","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jedunn.com\/wp-json\/wp\/v2\/blog"}],"about":[{"href":"https:\/\/jedunn.com\/wp-json\/wp\/v2\/types\/blog"}],"version-history":[{"count":3,"href":"https:\/\/jedunn.com\/wp-json\/wp\/v2\/blog\/6639\/revisions"}],"predecessor-version":[{"id":20979,"href":"https:\/\/jedunn.com\/wp-json\/wp\/v2\/blog\/6639\/revisions\/20979"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/jedunn.com\/wp-json\/wp\/v2\/media\/6641"}],"wp:attachment":[{"href":"https:\/\/jedunn.com\/wp-json\/wp\/v2\/media?parent=6639"}],"wp:term":[{"taxonomy":"campaigns","embeddable":true,"href":"https:\/\/jedunn.com\/wp-json\/wp\/v2\/campaigns?post=6639"},{"taxonomy":"type-of-content_tax","embeddable":true,"href":"https:\/\/jedunn.com\/wp-json\/wp\/v2\/type-of-content_tax?post=6639"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}